En

PROF.DR. MEHMET ÇAKMAKÇI MÜHENDİSLİK FAKÜLTESİ ENDÜSTRİ MÜHENDİSLİĞİ BÖLÜMÜ ENDÜSTRİ MÜHENDİSLİĞİ ANABİLİM DALI

  • Eğitim / Akademik Bilgisi
    Lisans  İstanbul Teknik Üniversitesi Sakarya Mühendislik Fakültesi Makina Bölümü  1982
    Doktora  Technische Üniversitat Wien Technische Üniversitat Wien TEKNİK BİLİMLER  1990
    Yardımcı Doçent  Dokuz Eylül Üniversitesi Mühendislik Fakültesi  2002
    Doçent  Mühendislik Fakültesi Endüstri Mühendisliği  2011
    Profesör  Dokuz Eylül Üniversitesi Mühendislik Fakültesi  2016
  • NO AD YIL
    1  Using Adaptive Neuro-Fuzzy Inference System, Artificial Neural Network and Response Surface Method t...  2017
    2  Fuzzy copras method for performance measurement in total productive maintenance: a comparative analy...  2016
    3  An ANFIS algorithm for forecasting Overall Equipment Effectiveness parameter in Total Productive Mai...  2015
    4  The Importance of Quality Control within the Relationship between the Quality Engineering and Taguch...  2015
    5  Improvement of Changeover Times via Taguchi Empowered SMED / Case Study on Injection Molding Product...  2014
    6  Impact of reliability on warranty: A study of, application in a large size company of electronics in...  2013
    7  İnsan Bacak Hareketleri İçin Prototip Dış iskelet Robotik Sisteminin Mekanik Tasarımı ve Hare...  2012
    8  Interaction between capability indices and skewness of nonnormal processes using quantile based esti...  2012
    9  A feasibility study using simulation based optimization and Taguchi experimental design method for m...  2012
    10  Novel Developments in Dimensional Nanometrology in the Context of Geometrical Product Specifications...  2012
    11  Küçük ve Orta Büyüklükteki Aile İşletmelerinde Organizasyonel Yapılanma: Kurumsallaşma, Ku...  2011
    12  Process improvement: performance analysis of the setup time reduction-SMED in the automobile industr...  2009
    13  Set-Up Time Reduction Process and Integrated Predetermined Time System MTM-UAS...  2007
    14  Otomotiv Yan Sanayinde KOBİ Ölçekli Şirketlerde Kurumsallaşma - Toplam Kalite Yönetimi İlişk...  2006
    15  Cylindricity a well known problem and new solutions...  1992
    16  Flexible Messzelle...  1991
  • NO AD TARİH
    1  Otonom Bakım Teknolojisinin Proje Maliyet Etkisi Çerçevesinde Endüstri 4.0 Yaklaşımına Entegr... 26/06/2018 - 29/06/2018
    2  Bir Elektronik Fabrikasında Kanban Uygulamasının Malzeme Sipariş Miktarlarının Optimizasyonu ... 26/06/2018 - 29/06/2018
    3  Proposal of New Performance Measures & Total Productive Maintenance Performance Measurement under Fu... 05/11/2015 - 06/11/2015
    4  Development and Evaluation of Novel Performance Measures for Total Productive Maintenance under Fuzz... 09/09/2015 - 11/09/2015
    5  Dynamic and Non-dynamic Organizational Structures: With The Project Management Approach Determinatio... 19/09/2014 - 20/09/2014
    6  Development of Novel Performance Measures for Total Productive Mainteanance based on Artificial Inte... 03/09/2014 - 05/09/2014
    7  An ANFIS model for forecasting risk by Overall Equipment Effectiveness parameter in Total Productive... 27/08/2013 - 29/08/2013
    8  An Adaptive Neuro-Fuzzy Inference System for Measurement of Total Productive Maintenance Effectivene... 01/07/2013 - 04/07/2013
    9  A Fuzzy Approach for Total Quality Maintenance in Manufacturing Systems... 26/06/2013 - 28/06/2013
    10  Nanometric measurement of the pre nano scale TiO2 powders via flame spray pyrolysis:synthesis, prope... 09/09/2012 - 14/09/2012
    11  Optimizasyon Ve Taguchi Yaklaşımı Kullanılarak Otomotiv Sanayiinde Taşıma-Aktarma Sistemleri ... 30/06/2010 - 02/07/2010
    12  Mathematical Modelling and Inverse Dynamic Analysis of Human Motion... 09/09/2009 - 11/09/2009
    13  Future sustainable freight transport of Turkey from road to rail in relation to European Union... 15/10/2008 - 17/10/2008
    14  Dynamic and Non-Dynamic Organizational Structures: Determination of success factors in Project Organ... 09/10/2007 - 11/10/2007
    15  Vehicle Routing Problem And An Application In FMCG Industry... 23/11/2005 - 24/11/2005
    16  Machine Tool Capability And Process Capability Study For Non-Normal Distribution In Advanced Manufac... 18/10/2005 - 19/10/2005
    17  Relationship Between Performance Of Human Factors And Man-Machine Interaction In Advanced Manufactur... 19/06/2005 - 22/06/2005
    18  Koordinatenmessgeraete in der flexible automatisierten Produktion ? Effizienz bei Einsatz und Überw... 05/05/1991 - 05/05/1991
    19  Computer assisted metrology and quality management in computer integrated industry... 04/04/1991 - 04/04/1991
    20  Qualitaetssicherung und Rechnerunterstützte Messtechnik... 24/04/1990 - 25/04/1990
    21  Flexible Messzelle... 04/04/1990 - 04/04/1990
  • NO BÖLÜM ADI YIL
    1  KANBAN Optimization in Relationship Between Industry 4.0 and Project Management Approach Agile Approaches for Successfully Managing and Executing Projects in the Fourth Industrial Revolutio...  2019
    2  Interaction in Project Management Approach Within Industry 4.0 Advances in Manufacturing II, Volume 1 - Solutions for Industry 4.0...  2019
    3  Performance Measurement of SMED Improved Plastic Injection Molding Production by Using Process Capability Analysis for Attribute Data Advances in Manufacturing II, Volume 2 - Production Engineering and Management...  2019
    4  Mathematical modelling and inverse dynamic analysis of human motion Proceedings of Twelfth International Conference on Climbing and Walking Robots and the Support Techn...  2010
  • NO AD TARIH
    1  İnsan Bacak Hareketleri için Prototip Exoskeleton Robotik Sistemler Geliştirilmesi...  12/2010 - 4/2013
    2  UEMUM-Ulusal Elektronik Malzemeler Üretimi ve Uygulama Mükemmeliyet Merkezi Kurulması Projesi...  1/2009 - /
  • NO AD YIL
    1  Avusturya Dışişleri Bakanlığı  1988
  • NO Görev
    1 Biyomedikal Metroloji ve Kalibrasyon Uygulama ve Araştırma Merkezi Merkez Yönetim Kurulu Üyesi, Kasım 2015- Kasım 2018
    2 DEÜ Tekstil, Hazır Giyim ve Boya Araştırma-Uygulama Merkezi Merkez Danışma Kurulu Üyesi, Ağustos 2013- Ağustos 2016
    3 Biyomedikal Metroloji ve Kalibrasyon Uygulama ve Araştırma Merkezi Merkez Danışma Kurulu Üyesi, Temmuz 2013- Temmuz 2016
    4 Elektronik Malzemeler Üretimi ve Uygulama Merkezi Merkez Danışma Kurulu Üyesi, Temmuz 2013- Temmuz 2016
    5 Kalite ve Mükemmellik Uygulama ve Araştırma Merkezi Merkez Yönetim Kurulu Üyesi, Aralık 2012- Aralık 2015
    6 Üniversite-Sanayi Uygulama ve Araştırma Merkezi Müdür Yardımcısı, Ekim 2012- Temmuz 2015
    7 Üniversite-Sanayi Uygulama ve Araştırma Merkezi Müdür Yardımcısı, Haziran 2011- Haziran 2012
    8 Mühendislik Fakültesi Endüstri Mühendisliği Bölümü Bölüm Başkan Yardımcısı, Eylül 2005- Ocak 2007