Education/Academic Info | ||
---|---|---|
Undergraduate Degree | Istanbul Technical University Sakarya Mühendislik Fakültesi Makina Bölümü | 1982 |
PhD (Doctorate) | Technische Ãœniversitat Wien Technische Ãœniversitat Wien TEKNÄ°K BÄ°LÄ°MLER | 1990 |
Assistant Professor | Dokuz Eylül University Mühendislik Fakültesi | 2002 |
Associate Professor | Turkish Inter-Universities Board Endüstri Mühendisliği | 2011 |
Full Professor | Dokuz Eylül University Mühendislik Fakültesi | 2016 |
NO | NAME | YEAR |
1 | Using Adaptive Neuro-Fuzzy Inference System, Artificial Neural Network and Response Surface Method t... | 2017 |
2 | Fuzzy copras method for performance measurement in total productive maintenance: a comparative analy... | 2016 |
3 | An ANFIS algorithm for forecasting Overall Equipment Effectiveness parameter in Total Productive Mai... | 2015 |
4 | The Importance of Quality Control within the Relationship between the Quality Engineering and Taguch... | 2015 |
5 | Improvement of Changeover Times via Taguchi Empowered SMED / Case Study on Injection Molding Product... | 2014 |
6 | Impact of reliability on warranty: A study of, application in a large size company of electronics in... | 2013 |
7 | İnsan Bacak Hareketleri İçin Prototip Dış iskelet Robotik Sisteminin Mekanik Tasarımı ve Hare... | 2012 |
8 | Interaction between capability indices and skewness of nonnormal processes using quantile based esti... | 2012 |
9 | A feasibility study using simulation based optimization and Taguchi experimental design method for m... | 2012 |
10 | Novel Developments in Dimensional Nanometrology in the Context of Geometrical Product Specifications... | 2012 |
11 | Küçük ve Orta Büyüklükteki Aile İşletmelerinde Organizasyonel Yapılanma: Kurumsallaşma, Ku... | 2011 |
12 | Process improvement: performance analysis of the setup time reduction-SMED in the automobile industr... | 2009 |
13 | Set-Up Time Reduction Process and Integrated Predetermined Time System MTM-UAS... | 2007 |
14 | Otomotiv Yan Sanayinde KOBİ Ölçekli Şirketlerde Kurumsallaşma - Toplam Kalite Yönetimi İlişk... | 2006 |
15 | Cylindricity a well known problem and new solutions... | 1992 |
16 | Flexible Messzelle... | 1991 |
NO | NAME | DATE |
1 | An application using stability increasing for the grinding machine performance improvement in the au... | 14/08/2020 - 15/08/2020 |
2 | The Problem of Selection with the Fuzzy Axiomatic Design of MEMS Based Sensors in Industry 4.0 Predi... | 21/07/2020 - 23/07/2020 |
3 | Otonom Bakım Teknolojisinin Proje Maliyet Etkisi Çerçevesinde Endüstri 4.0 Yaklaşımına Entegr... | 26/06/2018 - 29/06/2018 |
4 | Bir Elektronik Fabrikasında Kanban Uygulamasının Malzeme SipariÅŸ Miktarlarının Optimizasyonu Ã... | 26/06/2018 - 29/06/2018 |
5 | Proposal of New Performance Measures & Total Productive Maintenance Performance Measurement under Fu... | 05/11/2015 - 06/11/2015 |
6 | Development and Evaluation of Novel Performance Measures for Total Productive Maintenance under Fuzz... | 09/09/2015 - 11/09/2015 |
7 | Dynamic and Non-dynamic Organizational Structures: With The Project Management Approach Determinatio... | 19/09/2014 - 20/09/2014 |
8 | Development of Novel Performance Measures for Total Productive Mainteanance based on Artificial Inte... | 03/09/2014 - 05/09/2014 |
9 | An ANFIS model for forecasting risk by Overall Equipment Effectiveness parameter in Total Productive... | 27/08/2013 - 29/08/2013 |
10 | An Adaptive Neuro-Fuzzy Inference System for Measurement of Total Productive Maintenance Effectivene... | 01/07/2013 - 04/07/2013 |
11 | A Fuzzy Approach for Total Quality Maintenance in Manufacturing Systems... | 26/06/2013 - 28/06/2013 |
12 | Nanometric measurement of the pre nano scale TiO2 powders via flame spray pyrolysis:synthesis, prope... | 09/09/2012 - 14/09/2012 |
13 | Optimizasyon Ve Taguchi Yaklaşımı Kullanılarak Otomotiv Sanayiinde Taşıma-Aktarma Sistemleri Ä... | 30/06/2010 - 02/07/2010 |
14 | Mathematical Modelling and Inverse Dynamic Analysis of Human Motion... | 09/09/2009 - 11/09/2009 |
15 | Future sustainable freight transport of Turkey from road to rail in relation to European Union... | 15/10/2008 - 17/10/2008 |
16 | Dynamic and Non-Dynamic Organizational Structures: Determination of success factors in Project Organ... | 09/10/2007 - 11/10/2007 |
17 | Vehicle Routing Problem And An Application In FMCG Industry... | 23/11/2005 - 24/11/2005 |
18 | Machine Tool Capability And Process Capability Study For Non-Normal Distribution In Advanced Manufac... | 18/10/2005 - 19/10/2005 |
19 | Relationship Between Performance Of Human Factors And Man-Machine Interaction In Advanced Manufactur... | 19/06/2005 - 22/06/2005 |
20 | Koordinatenmessgeraete in der flexible automatisierten Produktion ? Effizienz bei Einsatz und Ãœberw... | 05/05/1991 - 05/05/1991 |
21 | Computer assisted metrology and quality management in computer integrated industry... | 04/04/1991 - 04/04/1991 |
22 | Qualitaetssicherung und Rechnerunterstützte Messtechnik... | 24/04/1990 - 25/04/1990 |
23 | Flexible Messzelle... | 04/04/1990 - 04/04/1990 |
NO | CHAPTER TITLE | YEAR |
1 | The Problem of Selection with the Fuzzy Axiomatic Design of MEMS Based Sensors in Industry 4.0 Predictive Maintenance ProcessIntelligent and Fuzzy Techniques: Smart and Innovative Solutions... | 2021 |
2 | Performance Measurement of SMED Improved Plastic Injection Molding Production by Using Process Capability Analysis for Attribute Data Advances in Manufacturing II, Volume 2 - Production Engineering and Management... | 2019 |
3 | Interaction in Project Management Approach Within Industry 4.0 Advances in Manufacturing II, Volume 1 - Solutions for Industry 4.0... | 2019 |
4 | KANBAN Optimization in Relationship Between Industry 4.0 and Project Management Approach Agile Approaches for Successfully Managing and Executing Projects in the Fourth Industrial Revolutio... | 2019 |
5 | Mathematical modelling and inverse dynamic analysis of human motion Proceedings of Twelfth International Conference on Climbing and Walking Robots and the Support Techn... | 2010 |
NO | NAME | DATE |
1 | Proje Yönetimi Yaklaşımıyla Engelli Toplu Taşımanın İyileştirilmesi... | 2/2022 - 9/2022 |
2 | Proje Yönetimi Yaklaşımıyla Engelli Toplu Taşıma Ulaşımında Risk Belirleme... | 2/2022 - 9/2022 |
3 | İnsan Bacak Hareketleri için Prototip Exoskeleton Robotik Sistemler Geliştirilmesi... | 12/2010 - 4/2013 |
4 | UEMUM-Ulusal Elektronik Malzemeler Üretimi ve Uygulama Mükemmeliyet Merkezi Kurulması Projesi... | 1/2009 - / |
NO | NAME | YEAR |
1 | Avusturya Dışişleri Bakanlığı | 1988 |
NO | Responsibility | |
1 | DEÜ Rectorate Endüstri 4.0 Koordinatörlüğü Kurulu Member, December 2022-Continues | |
2 | Biyomedikal Metroloji Ve Kalibrasyon Uygulama Ve AraÅŸtirma Merkezi , Member of The Central Board, November 2015- November 2018 | |
3 | D.E.Ü. Tekstil, Hazir Giyim Ve Boya Araştirma-Uygulama Merkezi , Member of The Central Board, August 2013- August 2016 | |
4 | Biyomedikal Metroloji Ve Kalibrasyon Uygulama Ve AraÅŸtirma Merkezi , Member of The Central Board, July 2013- July 2016 | |
5 | Elektronik Malzemeler Ãœretimi Ve Uygulama Merkezi , Member of The Central Board, July 2013- July 2016 | |
6 | Kalite Ve Mükemmellik Uygulama Ve Araştirma Merkezi , Member of The Central Board, December 2012- December 2015 | |
7 | Ãœniversite-Sanayi Uygulama Ve AraÅŸtirma Merkezi , Member of The Central Board, October 2012- July 2015 | |
8 | Ãœniversite-Sanayi Uygulama Ve AraÅŸtirma Merkezi , Member of The Central Board, June 2011- June 2012 | |
9 | Faculty of Engineering Department of Industrial Engineering , Vice Director of Department, September 2005- January 2007 |